Wood siding shingles and shakes.
Bottom nailling strip for wood siding shingles.
Patented surenail technology features a wide highly visible engineered fabric strip in the nailing area for a consistent quality installation and the unique product design provides.
Add felt if needed before nailing the new wood on and prime the new wood on all four sides before installing it.
But i used cedar strips for strapping and screws to install the shingles.
Thick and installed to hang below shim approximately 1 in.
Siding nail face nailing face nailing is applicable where dictated by building code in high wind areas and when fastening is to osb or equivalent sheathing without penetrating into studs.
Starter strip should be 4 5 in.
Install the kickout flashing underneath the first shingle photo 1.
If the shingle already has flashing on it the kickout flashing has to slip beneath it and you ll have to loosen or remove siding to do this.
4 position the top of the starter course along the chalk line use a straight edge on bottom of shingles if uniform straight edge is desired 5 the first course of shingle siding is then installed even with bottom edge of the starter course.
Sheathed wall starter strip starts shingles at the proper angle.
Attach shingles to the strapping one row at a time jogging the placement so one is higher and the next lower etc.
Install horizontal wood cedar strapping to the shed frame with screws higher up the shingle.
For all owens corning shingles roofing nails should penetrate into the wood deck by a minimum of inch or completely through the roof deck by a minimum of 1 8 inch.
Adapted paraphrased with permission from best practices guide to residential construction.
The recommended exposure varies depending on the size height of the shingles.
Starting from left to right level and install the siding so the bottom edge is no more than 1 2 inch below the starter strip.
Apply siding to wall assembly directly to wood structural panel sheathing.
Wood shingle siding nailing details.
For white cedar shingles maibec recommends a 5 inch exposure but that figure can vary up to 1 4 inch to make a layout work in the space you have measure from the underside of the soffit or the frieze board to the bottom of the sheathing and add the overhang see starter course below.
The difference between a good shingle and a great shingle is having surenail technology only available from owens corning on duration series shingles.
From the bottom edge of the starter strip.
The indentations profile cut outs of the bottom edge of the first course of siding must overlap.
If desired the starter strip can be cut from the top of the siding and the bottom portion used for the top course.
Begin by nailing a starter strip approximately 3 8 inch thick x 1 1 2 inch wide flush with bottom edge of sill plate.